PRESENT: Lisa
Rowland; John Taylor; Richard
Balm; Thomas
Schwarz; Mike
Langley; Pete
Masters
APOLOGIES RECEIVED:
CONFIRMATION OF PREVIOUS MINUTES: Committee
agreed that minutes of 13
December 2006 were a true and correct record, Accepted
by John/Richard
MATTERS ARISING:
1. Presentation to Tenon re sponsorship - ongoing
2. Cycling/Walking maps - Completed
3. Thank you letter sponsors - Lisa prepared a draft for
perusal by the committee
4. Harvey
Street gully sign
off - Pete
McFarlane and Lisa completed a walk through with Colin
Lunn of TDC - gully is now handed over
to Council for future maintenance
5. DoC paddock - Five Mile
Bay
- ongoing. Can currently open gates or
go over style. Need a wooden chicane. Pete will check with DoC
6. Power Point presentation for Council by CAN -
ongoing
7. Action Plan 2007 - Richard
will email out.
INCOMING/OUTGOING CORRESPONDENCE:
Incoming:
1. 18 December 06 -
TDC re Appl for Resource Consent Lakeview Ventures Ltd - update.
2. 10 January 07 - TDC
notification of proposed variations 19, 20, 21 (proposed Taupo District Plan)
3. 11 January 07 - TDC - Contract of Service
response
4. 24 January 07 - fax
from Environment Waikato re W2K
Outgoing:
1. Nil
Accepted by Richard/Thomas
TREASURERS REPORT:
OO Cheque: $15,706.91
O1 Account balance (W2K) is $1,285.00
Petty Cash: $3.90
Receipts: $1,051.20
Payments:
$4,211.31
Outstanding
Debtors invoices: $1,052.50
Bond The bond
for use of Spa
Park
(Lake Taupo Cycle Challenge) has not been returned as yet. John is dealing with Glen Holschier on
this. He has now advised that it�s
been actioned and will be in our bank account in two days.
Map Pricing: The A4 maps costing $61.20 per 100 +
GST. Sold for $1.50 ea GST inc. Profit
of 72 cents each.
A3 maps costing $122.40 per 100 + GST. Selling at $1.50 ea GST inc. gives a profit
of only 11 cents each.
Accepted: Lisa/Pete
SUBCOMMITTEE REPORTS:
Subcommittee headings for the new committee
were discussed and agreed as follows:
1. Urban/Rural cycle facilities (includes
liaison with TDC, gullies etc) - Thomas, Lisa and Mike
2. Media/Promotion & Website - Thomas and Lisa with Jonty perhaps
3. Submissions - Richard
4. Funding - Barry
Shepherd (seconded on)
5. Maintenance - Pete
6. Wairakei Forest - Richard
7. W2K - Pete
8. CAN Update - Thomas
Geoff was
absent from meeting so next meeting we will see where he�d like to fit in.
Urban/Rural Cycle Facilities:
1. Lisa to arrange an informal meeting with Bob Hopkins and Jess Raethel
(TDC roading) to encourage a good relationship with them and talk about any
issues and how we can help each other. Possibly the Friday after Waitangi Day.
2. Jess of TDC Roading Dept updated us on their cycle projects for
2006/2007.
• Shared Path
Huka Falls Road: Developers of the new subdivision next to
Wishart Winery are to build the footpath along Huka Falls Road 2 metres for a
shared path. 170m will be constructed
this year and the final 430 metres at a later date.
• Shared path
Spa Road/Centennial Drive - 2metre wide
shared path to be from end of existing footpath on Spa Road linking onto
existing shared path on Centennial Drive (length 550m) to be constructed
2007/2008
• Alterations
to cycle lane north bound on SH1 near Mere
Road intersection is underway
• Re-marking
of Crown Park Cycle facility completed mid 2006 - for education and
awareness for school children
• Formalising
and remarking SW bound cycle lane on Spa Road consultation may need to be carried out with businesses along Spa
Road on this one and we will be
kept informed of progress. (Committee Discussion: currently the law is not being forced. It�s classified as a cycle lane by the
markings but cars clearly still park on the lane which is illegal. It�s a critical route and shouldn�t be
ignored. Regarding businesses affected
many of them are on corners and have side street access to their business)
• Pedestrian
Refuge at Rainbow Point on SH1 - Jess hasn�t heard from Transit and suggested
we write to them again requesting progress of decision. (Committee discussion: Lisa to write to Alan Burkett again)
• Future
cycle projects we are invited to notify any further projects we would like to see
happen so she can try and incorporate them in the 2008/09 programme. TDC has $18,000 every second year for
construction of new cycle facilities. Green
Paint is on the top of the list for 2008/09.
Other
committee discussion: The rails on State Highway 5 pedestrian refuge have gone which makes its
hard for bike to cross and takes away the safety barriers.
There is a
trout on the large Waitahanui speed signs but nothing on the other side - any
chance of putting a bike up there?
There is no
safe passage for bikes into Waitahanui ie. There�s a nice wide shoulder
leading into and out of but then it disappears once you hit the new big speed
signs. Need good access behind them as
previously suggested.
Lisa to
bring these points up with Jess.
|
Media Promotion and Website:
1. New Walking and Cycling maps are out in circulation and look ok. A couple of changes to be done however,
which Thomas will action. Ie. Take out
the Wairakei tracks and make the whole map bigger utilising the whole
page. Our involvement in the maps is
printing and invoicing the retailers selling them.
2. We will look into the possibility of putting contours onto the
Wairakei map.
3. Another idea is to make the maps available for conference packs giving
delegates options to do short walks/rides around Taupo around Taupo in breaks
or after conference.
4. Bikewise week is from 26th February. Bike to Work day will be on the Wednesday
28th February. Bike
Taupo will once again volunteer our
help for this event. Thomas will
organise the banner and some Bike Taupo
info.
Submissions:
The annual plan is out for submission in March/April - Richard to attend to
Funding/Projects:
1. Taupo Moana Rotary Club is interested in funding the Bungy track
realignment. This will in future link
the fifth mountain bike leg of the Cycle Challenge to the start line in Taupo
town. Richard to look at applying to
them.
Maintenance:
1. Had a tree come down on the Te Totara track and currently shifting
other branches on the Rotary track.
2. Maintenance has been ongoing especially with the earlier summer rain
3. Fast Eddy track is now one way into Bumble Bee. An email will go out to all members
advising and signs will shortly go up.
Wairakei Forest Mountain Bike System
1. The Luge is a new downhill off the Retro track and runs into
slalom.
2. General maintenance is being carried out.
W2K Track
1. Ongoing discussions.
CAN Update
1. Bike NZ is introducing a loyalty programme for members of $20 p/p and
includes benefits
2. CAN is trialling in newsletter an offer to join for $36 to gain all
benefits including Chainlinks mag and subscription to Endurance mag.
3. CAN wants to push the ‘Friends of CANZ’ option.
GENERAL BUSINESS:
1. Action Plan 2007: Richard will email out something prior to
next meeting.
Meeting closed 9:05pm
NEXT MEETING:
• 7
March 2007 at 7pm
COMMITTEE JOBS |
NAME |
Meeting with Roading dept |
Lisa |
Thank you letter sponsors |
Lisa |
Annual Plan - March/April |
Richard |
Doc Paddock Five Mile Bay |
Pete |
PowerPoint presentation for Council - CAN |
Thomas |
Action Plan 2007 |
Richard |
Taupo Moana Rotary - appl for funding |
Richard |
TDC issues to be raised with Jess |
Lisa |
|